This would be excellent news.
In regards to the next steps….
The plans are very technical as seen on the portal and I’d assume they were ready or very nearly for a build.
GMI, who gave the information at the supporters meeting a coup of years ago will be doing the build, as they are the Axiom site. Economies of scale will mean a cheaper build than the stadium on its own. I was also under the impression that we’d get a full build for 2m plus their 12.2m. If there’s any change (there never is) would be GMIs. So no cutting back like the 1.5 stands at wakey.